Dell Seton Medical Center at UT, 4th Floor Finish Out

Client:

Seton Healthcare Family

Size:

9,800 SF

Architect:

HKS

Delivery Method:

Guaranteed Maximum Price

This project included the complete finish out of 8,000-SF of the fourth floor of the occupied Dell Seton Medical Center at The University of Texas at Austin. Fifteen much-needed patient rooms were added within the Transplant ICU of the teaching hospital. Each room included wood paneling casework at the head and foot of each bed. A pneumatic tube system was installed and tied in to the hospital’s network to facilitate the quick and efficient transport of medication to the unit. The finish out also featured an on-call room, staff break room, nourishment room for patient families, and medical storage.

 

Buzz:

Sabre celebrates Grand Opening of Transplant ICU at Dell Seton Medical Center at UT

Image of the healthcare finish out for the Dell Seton Medical Center at UT
Image of the healthcare finish out for the Dell Seton Medical Center at UT
Image of the healthcare finish out for the Dell Seton Medical Center at UT
Image of the Nourishment Room within the Dell Seton Medical Center at UT
Image of the patient millwork installed at the Dell Seton Medical Center at UT
Image of the medical storage room within the fourth floor finish out at Dell Seton Medical Center at UT
Image of the installed pneumatic tube system at the Dell Seton Medical Center at UT